Rail Bridge (Humphery)

  • 600518
  • Mungar to Monto line, Gayndah

General

Classification
State Heritage
Register status
Entered
Date entered
21 October 1992
Type
Transport—rail: Bridge—railway
Theme
5.3 Moving goods, people and information: Using rail
Architect
Pagan, William
Construction period
1913, Rail Bridge (Humphery) (1913 - 1913)
Historical period
1900–1914 Early 20th century

Location

Address
Mungar to Monto line, Gayndah
LGA
North Burnett Regional Council
Coordinates
-25.61506559, 151.45361091

Map

Street view

Photography is provided by Google Street View and may include third-party images. Images show the vicinity of the heritage place which may not be visible.

Request a boundary map

A printable boundary map report can be emailed to you.

Significance

Criterion AThe place is important in demonstrating the evolution or pattern of Queensland’s history.

This bridge, which allowed the railway to cross a deep gully, is on a branch line linking early inland towns with Maryborough and demonstrates the way in which Queensland was developed by linking important inland resources with ports. It demonstrates the skill with which the technology of the era was used to solve the problems of climatic conditions and terrain encountered by railway engineers in this process.

Criterion FThe place is important in demonstrating a high degree of creative or technical achievement at a particular period.

This bridge was built to an innovative design with reinforced concrete discontinuous wall-type pinned arches, the second of its type in Australia and only the seventh concrete bridge in Queensland. It was the last of a series of concrete arch bridges built for the Queensland railways between 1900 and 1913 and the third on this line.

Criterion HThe place has a special association with the life or work of a particular person, group or organisation of importance in Queensland’s history.

The bridge is an important example of the work of William Pagan, Chief Engineer for Railways and an important figure in the early history of engineering in Queensland.

History

The concrete arch bridge supporting the railway line 2.8 kilometres west of Humphery was constructed in 1913 as the last of several bridges on this line.

Maryborough requested a rail link to the long established town of Gayndah in the 1860s, although construction did not begin until the late 1880s. The line opened to Brooweena in July 1889, Boompa in March 1891 and Biggenden in April 1891. Although the rails ended at Degilbo, this section was not opened until 1893 when flood damage to the Mary River Bridge at Antigua cut off the lime supply for the sugar industry at Maryborough and Bundaberg and a new supply was opened up near Degilbo.

The line ended at Degilbo until the extension to Gayndah began with a 32 kilometre extension to Wetheron that opened in December 1905. Gayndah was finally reached in December 1907. In 1910 a further extension was proposed. Construction of the railway between Gayndah and Mundubbera began in April 1911, anticipating by a few months the officially turning of the first sod by Paget, Minister for Railways, on 7 July 1911. The line was opened for traffic between Gayndah and Boomerang in November 1913 and to Mundubbera in February 1914. The line was further extended in the 1920s and reached Monto in September 1928.

The use of concrete arches for railway bridges is a distinctive feature in Queensland and South Australia. The first concrete bridge in Queensland was constructed at Petrie Terrace in 1897. Between 1900 and 1913, six arch concrete railway bridges were constructed in Queensland approximating with the term in office of William Pagan as Chief Engineer of Railways and it is believed that he was responsible for their design. The first two, at Rangeview, near Toowoomba and at Deep Creek, Chowey, followed the form of a stone arch bridge. That constructed at Steep Rocky Creek, Gayndah in 1906 departs completely from stone forms and has wall type arches supporting vertical diaphragms with a deck slab carrying the track and ballast. This bridge was built to cross a ravine in rugged country and represents a similar design and technical developments to meet similar requirements to that at Humphery, which was completed a few years later.

Description

The bridge is a concrete arch bridge carrying the Mungar to Monto railway over a dry gully some 2.8 km south west of Humphrey Station and 14 km west of Gayndah. It has five semicircular arch spans, with solid concrete spandrel walls. Although a simple bridge, it is well detailed with projecting cornices at the bases of the arches, attached pillars above the piers extending above the deck and recessed spandrel walls.

The bridge carries a single 1.07m gauge railway on a ballasted deck. Its spans are 7.9m, three at 10.7m and 7.9m totalling 42.9m. The solid arch ribs are semicircular, with projecting cornices separating them visually from the piers below. The smaller end spans spring from a higher level, again marked at the pier by a small cornice. The recessed spandrel walls are finished off with the form concrete slightly patterned to contrast with the smooth finish of the projecting faces of the arches. The railings are of tubular metal between concrete pillars at the piers.

Image gallery

Location

Location of Rail Bridge (Humphery) within Queensland
Licence
Creative Commons Attribution 4.0 International (CC BY 4.0)
Last reviewed
1 July 2022
Last updated
20 February 2022