Annual returns

Details of the annual return RET-100553256

Annual return status: Completed
Customer name: GULF ALUMINA PTY LTD
Annual return due date: 01/04/2024
Reporting period: 01/01/2023 - 31/12/2023
Permit reference: EPML00967013
Industry: Minerals
Condition Type: Site-specific
Permit holder(s): GULF ALUMINA PTY LTD
Activity Location
Ancillary 08 - Chemical Storage
3 - Storing more than 500 cubic metres of chemicals of class C1 or C2 combustible liquids under AS 1940 or dangerous goods class 3 under subsection (1)(c)

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Ancillary 15 - Fuel burning
Using fuel burning equipment that is capable of burning at least 500kg of fuel in an hour

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Ancillary 33 - Crushing, milling, grinding or screening
Crushing, grinding, milling or screening more than 5000t of material in a year

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Ancillary 49 - Boat maintenance or repair
Operating, on a commercial basis, a boat maintenance or repair facility for maintaining or repairing hulls, superstructure or mechanical components of boats or seaplanes

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Ancillary 60 - Waste disposal
1(a) - Operating a facility for disposing of, in a year, the following quantity of waste mentioned in subsection (1)(a) - less than 50,000t

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Ancillary 63 - Sewage Treatment
1(b-i) - Operating sewage treatment works, other than no-release works, with a total daily peak design capacity of more than 100 but not more than 1500EP if treated effluent is discharged from the works to an infiltration trench or through an irrigation scheme

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Schedule 3
11 - Mining bauxite

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Schedule 3
20(c) - Clay pit mining, dimension stone mining or mining gemstones (including the material from which gemstones are extracted) - more than 1,000,000t in a year

ML40069:
MAPOON ABORIGINAL SHIRE

ML40082:
MAPOON ABORIGINAL SHIRE

ML6025:
MAPOON ABORIGINAL SHIRE

Question Answer
PRCP / no PRCP A resource activity without an approved Progressive Rehabilitation and Closure Plan (PRCP) schedule – Only complete sections 1 and 3 of this form.
Section 1
1. Change may affect ERC decision? No
2. EA for eligible resource activity? No
3. EA for ineligible resource activity without approved PRCP schedule? I/We have submitted GIS spatial information, which represents the onsite disturbance and rehabilitation within Table 1.

Spatial information has been submitted via the department’s spatial information submission inbox - spatialsubmit@des.qld.gov.au.

GIS spatial information has been prepared in accordance with the department’s Guideline - Spatial Information Submission (ESR/2018/4337), specifically Attachment 2 - Annual returns – shapefile attributes and submission requirements.

I/We have provided a summary of the onsite disturbance and rehabilitation within Table 1.

Yes
4. EA for ineligible Resource Activity for CSG? No
Table 1. Area of disturbance / rehabilitation
Table 1 (1 Total Area ha) 3401.2000
Table 1 (1 Spatial Submitted) N/A
Table 1 (2 Total Disturbance ha) 352.7900
Table 1 (2 Spatial Submitted)
Table 1 (3 Total Rehab Certified ha) 0.0000
Table 1 (3 Spatial Submitted)
Table 1 (4 Total Rehab Completed ha) 33.2100
Table 1 (4 Spatial Submitted)
Table 1 (5 Total Rehab Commenced ha) 0.0000
Table 1 (5 Spatial Submitted)
Table 1 (6 Area Disturbed ha) 0.0000
Table 1 (6 Spatial Submitted)
Table 1 (7 Approved Progressive Certification ha) 0.0000
Table 1 (7 Spatial Submitted)
Table 1 (8 Rehab not yet Approved ha) 2.6000
Table 1 (8 Spatial Submitted)
Table 1 (9 Rehab Commenced ha) 0.0000
Table 1 (9 Spatial Submitted)
Table 1 (10 Proposed Disturbance ha) 0.0000
Table 1 (10 Spatial Submitted)
Table 1 (11 Rehab for Certification ha) 0.0000
Table 1 (11 Spatial Submitted)
Table 1 (12 Rehab not for Certification ha) 70.0000
Table 1 (12 Spatial Submitted)
Table 1 (13 Rehab to Commence ha) 0.0000
Table 1 (13 Spatial Submitted)
Section 2
5. Has there been a change to the carrying out of the resource activity that may affect the estimated rehabilitation cost (ERC) decision for the activity?
6. Has the required GIS Spatial information been submitted in accordance with an approved PRC Plan?
7. Have you complied with your PRCP schedule?
8. Have you complied with all other conditions imposed on the PRCP schedule?
9. Are works related to any other rehabilitation or management milestones underway?
Table 2. Area of disturbance / rehabilitation / improvement (PRCP)
Table 2 (1 Total Area ha)
Table 2 (1 Spatial Submitted)
Table 2 (2 Total Disturbance ha)
Table 2 (2 Spatial Submitted)
Table 2 (3 Total Rehab Certified ha)
Table 2 (3 Spatial Submitted)
Table 2 (4 Total Rehab Completed ha)
Table 2 (4 Spatial Submitted)
Table 2 (5 Total Rehab Commenced ha)
Table 2 (5 Spatial Submitted)
Table 2 (6 Total Sufficient Improvement ha)
Table 2 (6 Spatial Submitted)
Table 2 (7 Total Improvement Commenced ha)
Table 2 (7 Spatial Submitted)
Table 2 (8 Area Disturbed ha)
Table 2 (8 Spatial Submitted)
Table 2 (9 Approved Progressive Certification ha)
Table 2 (9 Spatial Submitted)
Table 2 (10 Rehab not yet Approved ha)
Table 2 (10 Spatial Submitted)
Table 2 (11 Rehab Commenced ha)
Table 2 (11 Spatial Submitted)
Table 2 (12 Sufficient Improvement ha)
Table 2 (12 Spatial Submitted)
Table 2 (13 Improvement Commenced ha)
Table 2 (13 Spatial Submitted)
Table 2 (14 Proposed Disturbance ha)
Table 2 (14 Spatial Submitted)
Table 2 (15 Rehab for Certification ha)
Table 2 (15 Spatial Submitted)
Table 2 (16 Rehab not for Certification ha)
Table 2 (16 Spatial Submitted)
Table 2 (17 Rehab to Commence ha)
Table 2 (17 Spatial Submitted)
Table 2 (18 Proposed Sufficient Improvement ha)
Table 2 (18 Spatial Submitted)
Table 2 (19 Improvement to Commence ha)
Table 2 (19 Spatial Submitted)
Section 3
Signatory Name Caroline Sorkoka
Signatory Position AHR
Date 12/06/2024

Related documents

Document title Document link
RET-100553256 view document (XLSX)

Related environmental authorities

To view other information holdings which may be related to the Environmental Authority, select the associated permit number below.

Permit number Status Effective date
EPML00967013 Granted 29/09/2025