Annual returns

Details of the annual return RET-100164719

Annual return status: Completed
Customer name: Peabody (Burton Coal) Pty Ltd
Annual return due date: 01/04/2022
Reporting period: 01/01/2021 - 31/12/2021
Permit reference: EPML00879213
Industry: Coal
Condition Type: Site-specific
Permit holder(s): Peabody (Burton Coal) Pty Ltd
Activity Location
Ancillary 60 - Waste disposal
2(c) - Operating a facility for disposing of, in a year, the following quantity of waste mentioned in subsection (1)(b) - more than 5000t but not more than 10,000t

MDL308:
ISAAC REGIONAL

ML70252:
ISAAC REGIONAL

ML70256:
ISAAC REGIONAL

ML70258:
ISAAC REGIONAL

ML70259:
ISAAC REGIONAL

Ancillary 62 - Resource recovery and transfer facility operation
1(c) - Operating a facility for receiving and sorting, dismantling, baling or temporarily storing category 2 regulated waste

MDL308:
ISAAC REGIONAL

ML70252:
ISAAC REGIONAL

ML70256:
ISAAC REGIONAL

ML70258:
ISAAC REGIONAL

ML70259:
ISAAC REGIONAL

Ancillary 63 - Sewage Treatment
1(b-i) - Operating sewage treatment works, other than no-release works, with a total daily peak design capacity of more than 100 but not more than 1500EP if treated effluent is discharged from the works to an infiltration trench or through an irrigation scheme

MDL308:
ISAAC REGIONAL

ML70252:
ISAAC REGIONAL

ML70256:
ISAAC REGIONAL

ML70258:
ISAAC REGIONAL

ML70259:
ISAAC REGIONAL

Schedule 3
13 - Mining black coal

MDL308:
ISAAC REGIONAL

ML70252:
ISAAC REGIONAL

ML70256:
ISAAC REGIONAL

ML70258:
ISAAC REGIONAL

ML70259:
ISAAC REGIONAL

Schedule 3
09 - A mining activity involving drilling, costeaning, pitting or carrying out geological surveys causing significant disturbance

MDL308:
ISAAC REGIONAL

ML70252:
ISAAC REGIONAL

ML70256:
ISAAC REGIONAL

ML70258:
ISAAC REGIONAL

ML70259:
ISAAC REGIONAL

Question Answer
PRCP / no PRCP A resource activity without an approved Progressive Rehabilitation and Closure Plan (PRCP) schedule – Only complete sections 1 and 3 of this form.
Section 1
1. Change may affect ERC decision? No
2. EA for eligible resource activity? No
3. EA for ineligible resource activity without approved PRCP schedule? I/We have submitted GIS spatial information, which represents the onsite disturbance and rehabilitation within Table 1.

Spatial information has been submitted via the department’s spatial information submission inbox - spatialsubmit@des.qld.gov.au.

GIS spatial information has been prepared in accordance with the department’s Guideline - Spatial Information Submission (ESR/2018/4337), specifically Attachment 2 - Annual returns – shapefile attributes and submission requirements.

I/We have provided a summary of the onsite disturbance and rehabilitation within Table 1.

Yes
4. EA for ineligible Resource Activity for CSG? No
Table 1. Area of disturbance / rehabilitation
Table 1 (1 Total Area ha) 5535.7500
Table 1 (1 Spatial Submitted) N/A
Table 1 (2 Total Disturbance ha) 669.5700
Table 1 (2 Spatial Submitted) Yes
Table 1 (3 Total Rehab Certified ha) 0.0000
Table 1 (3 Spatial Submitted) N/A
Table 1 (4 Total Rehab Completed ha) 1000.6000
Table 1 (4 Spatial Submitted) Yes
Table 1 (5 Total Rehab Commenced ha) 66.1700
Table 1 (5 Spatial Submitted) Yes
Table 1 (6 Area Disturbed ha) 0.0000
Table 1 (6 Spatial Submitted) N/A
Table 1 (7 Approved Progressive Certification ha) 0.0000
Table 1 (7 Spatial Submitted) N/A
Table 1 (8 Rehab not yet Approved ha) 0.0000
Table 1 (8 Spatial Submitted) N/A
Table 1 (9 Rehab Commenced ha) 66.1700
Table 1 (9 Spatial Submitted) Yes
Table 1 (10 Proposed Disturbance ha) 0.0000
Table 1 (10 Spatial Submitted) N/A
Table 1 (11 Rehab for Certification ha) 0.0000
Table 1 (11 Spatial Submitted) N/A
Table 1 (12 Rehab not for Certification ha) 224.6700
Table 1 (12 Spatial Submitted) Yes
Table 1 (13 Rehab to Commence ha) 224.6700
Table 1 (13 Spatial Submitted) Yes
Section 2
5. Has there been a change to the carrying out of the resource activity that may affect the estimated rehabilitation cost (ERC) decision for the activity?
6. Has the required GIS Spatial information been submitted in accordance with an approved PRC Plan?
7. Have you complied with your PRCP schedule?
8. Have you complied with all other conditions imposed on the PRCP schedule?
9. Are works related to any other rehabilitation or management milestones underway?
Table 2. Area of disturbance / rehabilitation / improvement (PRCP)
Table 2 (1 Total Area ha)
Table 2 (1 Spatial Submitted)
Table 2 (2 Total Disturbance ha)
Table 2 (2 Spatial Submitted)
Table 2 (3 Total Rehab Certified ha)
Table 2 (3 Spatial Submitted)
Table 2 (4 Total Rehab Completed ha)
Table 2 (4 Spatial Submitted)
Table 2 (5 Total Rehab Commenced ha)
Table 2 (5 Spatial Submitted)
Table 2 (6 Total Sufficient Improvement ha)
Table 2 (6 Spatial Submitted)
Table 2 (7 Total Improvement Commenced ha)
Table 2 (7 Spatial Submitted)
Table 2 (8 Area Disturbed ha)
Table 2 (8 Spatial Submitted)
Table 2 (9 Approved Progressive Certification ha)
Table 2 (9 Spatial Submitted)
Table 2 (10 Rehab not yet Approved ha)
Table 2 (10 Spatial Submitted)
Table 2 (11 Rehab Commenced ha)
Table 2 (11 Spatial Submitted)
Table 2 (12 Sufficient Improvement ha)
Table 2 (12 Spatial Submitted)
Table 2 (13 Improvement Commenced ha)
Table 2 (13 Spatial Submitted)
Table 2 (14 Proposed Disturbance ha)
Table 2 (14 Spatial Submitted)
Table 2 (15 Rehab for Certification ha)
Table 2 (15 Spatial Submitted)
Table 2 (16 Rehab not for Certification ha)
Table 2 (16 Spatial Submitted)
Table 2 (17 Rehab to Commence ha)
Table 2 (17 Spatial Submitted)
Table 2 (18 Proposed Sufficient Improvement ha)
Table 2 (18 Spatial Submitted)
Table 2 (19 Improvement to Commence ha)
Table 2 (19 Spatial Submitted)
Section 3
Signatory Name Sean Kendall Allen
Signatory Position Director
Date 31/03/2022

Related documents

Document title Document link
RET-100164719 view document (XLSX)

Related environmental authorities

To view other information holdings which may be related to the Environmental Authority, select the associated permit number below.

Permit number Status Effective date
EPML00879213 Granted 24/08/2020